KTM Duke 690 2012-2016 GPR Exhaust Systems Mid System Catalyzed GPE Ti Muffler
KTM Duke 690 2012-2016 GPR Exhaust Systems Mid System Catalyzed GPE Ti Muffler
KTM Duke 690 2012-2016 GPR Exhaust Systems Mid System Catalyzed GPE Ti Muffler
KTM Duke 690 2012-2016 GPR Exhaust Systems Mid System Catalyzed GPE Ti Muffler

KTM Duke 690 2012-2016 GPR Exhaust Systems Mid System Catalyzed GPE Ti Muffler

Regular price
$677.00
Sale price
$677.00

Lightweight GPE Titanium silencer weighs only 1.6 Kg aproximate.

Catalyzed Mid System EC Road legal with removable DB killer. #KTM.52.GPETI

  • GPE Grand Prix Evolution original GPR's racing design.
  • Silencer made of fine Titanium.
  • With Carbon look Ergal end cap.
  • EC certified road legal with removable DB killer.
  • Produced using hand made craftsmanship and advanced TIG welding. 
  • All mounting hardware included for a perfect fitment.
  • Joints\ mid pipes included where applicable. No modification needed.

Manufacturer: GPR Italy

  • Designed and Dyno-tested in GPR's factory.
  • Hand hand made in Italy, using advanced TIG welding.
  • Allows better gas outflow and increase in horsepower and acceleration.
  • The GPR design proves successful in performance and sound.
  • The kit is light weight and will shed off significant pounds of the bike.
  • Includes Stainless Steel link pipe and hardware where needed.
  • Comes with GPR's 2 years warranty.

GPR has been making motorcycle exhaust in Milan-Italy for several decades with the spirit of MotoGP and SBK racing, using knowledge acquired thru racing research while sponsoring and supplying riders such as: Casey Stoner, Carlos Checa, Makoto Tamada, Alex Barros and more.

Designed and Dyno-tested in house at GPR's factory

We are authorized distributors for GPR Exhaust since 2007 So we carry all available options for your bike! We also ride and race our selfs so we know bikes on road and on track.

International orders ship with Express courier, insured and tracked on-line. While we try keep a large variety of items ready on hand, 14-22 work days are needed for production.