Honda RC51 SP2 High Mount GPR Exhaust Systems Deeptone CF Slipon Mufflers Cans
Honda RC51 SP2 High Mount GPR Exhaust Systems Deeptone CF Slipon Mufflers Cans
Honda RC51 SP2 High Mount GPR Exhaust Systems Deeptone CF Slipon Mufflers Cans
Honda RC51 SP2 High Mount GPR Exhaust Systems Deeptone CF Slipon Mufflers Cans

Honda RC51 SP2 High Mount GPR Exhaust Systems Deeptone CF Slipon Mufflers Cans

Regular price
€736,08
Sale price
€736,08

Honda RC51 SP2 (not sp1)

High Mount kit with link pipes and hardware to locate it high. Will lose rear footpegs.

Dual (x2) durable round Deeptone CF silencer weighs only 1.6 Kg each. Unrestricted racing type. 

Hand made in Italy from Aisi 304 Stainless Steel with a sleeve of Carbon look material for added design.

Hand made craftsmanship using advanced TIG welding.

All mounting hardware included for a perfect fitment. Joints\ mid pipes included where applicable. No modification needed.

Manufacturer: GPR Italy

Designed and Dyno-tested in GPR's factory and hand made in Italy, using advanced TIG welding. Allows better gas outflow from the engine and an increase in horsepower and acceleration. The GPR design proves successful in performance and sound. The kit is lightweight and will shed off significant pounds of the bike. Includes Stainless Steel link pipe and hardware where needed. Comes with GPR's 2 years warranty. GPR has been making motorcycle exhaust in Milan-Italy for several decades with the spirit of MotoGP and SBK racing, using knowledge acquired thru racing research while sponsoring and supplying riders such as: Casey Stoner, Carlos Checa, Makoto Tamada, Alex Barros and more.

Designed and Dyno-tested in GPR's factory

GPR exhausts that we sell come with a full GPR warranty!

We have been authorized distributors for GPR Exhaust since 2007 So we carry all available options for your bike! We also ride and race ourselves selves so we know bikes on road and on track.

International orders ship with express courier, insured, and tracked on-line. While we try to keep a large variety of items ready on hand, 14-24 days are needed for production.